  1. (a)

    The time (TT) spent on erecting a concrete pillar is partly constant and partly varies as three times the base area (AA). If it took 27 hours to erect a pillar with a base area of 24 m224\text{ m}^2 and 52 hours for a pillar with a base area of 48 m248\text{ m}^2, find the time taken to erect a pillar with base area 60 m260\text{ m}^2.

Worked solution (try it first)

(a)

  1. "Partly constant and partly varies as three times the base area": T=a+b(3A)=a+3bAT = a + b(3A) = a + 3bA, with TT in hours and AA in m².
  2. A=24A = 24, T=27T = 27: a+72b=27a + 72b = 27.
  3. A=48A = 48, T=52T = 52: a+144b=52a + 144b = 52.
  4. Subtract: 72b=2572b = 25, so b=2572b = \frac{25}{72}.
  5. Then a=27−72×2572a = 27 - 72 \times \frac{25}{72}
    =27−25= 27 - 25
    =2= 2.
  6. So T=2+3×2572AT = 2 + 3 \times \frac{25}{72}A
    =2+2524A= 2 + \frac{25}{24}A.
  7. For A=60A = 60: T=2+2524×60T = 2 + \frac{25}{24} \times 60
    =2+6212= 2 + 62\frac12
    =6412= 64\frac12 hours.